Periodic inspection of AX-1
Tools for the completion of a periodic inspection
Kilter has developed tools and a user interface for testing and inspecting components critical to achieving an accurate herbicide application. The protocol is based on ISO 16122-1:2024 and ISO 16122-2:2024. The protocol can be found here: Periodic inspection protocol, and the user interface described below guides a user step by step on how to perform the inspection.
Kilter's nozzle performance assessment tools are included with each machine. of nozzle performance and these should be provided with each machine.
Tools required
- Pump flow meter (0–15 litres per minute) with pressure adjustment (0–4 bar)
- Pressure sensor
- Kilter's patternator tool
Granting access
You can grant a workshop or inspector temporary access to the machine for 24 hours via Kilter Farm.
Periodic inspection user interface
To access the periodic inspection protocol, open the Kilter Remote and go to Settings, Spraying, and choose Periodic Inspection.

Performing periodic inspection
Follow the step by step guide to perform the periodic inspection.